Skip to content

Business fields

PowerTech solutions dramatically reduce steam turbine cooling time
We protect customers’ profits by improving power plant utilization.
Steam turbine forced cooling system using air heater

Forced cooling system

Business 01

Power Tech Solution

Drastically shortens the steam turbine cooling time and improves availability
of the power plant to protect the customer’s benefits.

Expected Benefit

Power Tech Solution’s forced cooling system dramatically shortens the overhaul critical path, maximizing the operation period of power generation facilities,
allowing customers to maximize profits.
500MW Class

About 500,000 USD/day
(2,000,000 USD/times)

800MW Class
About 700,000 USD/day
(3,500,000 USD/times)
1,000MW Class
About 1,000,000 USD/day
(6,000,000 USD/Times)
Force Cooling Air path for HP Turbine
Force Cooling Air path for IP Turbine

Forced Cooling Control System

Shinboryeong Unit 1 forced cooling curve

Acquisition of domestic patent and application for registration of overseas patent
Selected as an in-house venture support project

2022.06

1,000MW Class

Applied to Shinboryeong Unit 1 Test Bed

2022.10

500MW Class

Supply and installation of Boryeong Thermal Power Plant Unit 8

2023.05

Shinboryeong Unit 2

Supply and installation

2024.05

Boryeong Thermal Power Plant Unit 7

Supply and installation

2024.10

800MW Class

Planned to supply to
GHECO ONE POWER PLANT
in Thailand

2024.11/2025.03

800MW Class

Scheduled to supply Cirebon 2 to Indonesia

2024.11

Taean Units 9 and 10

Supply and installation scheduled

2022.05.10

Steam turbine forced cooling system

Obtained a patent

2022.07

Passed the innovation evaluation

2022.08

Passed the publicness evaluation

2022.12

Passed procurement evaluation

Manufacturing factory registration in progress

2023.03.30

Innovative product

Obtain certification